South Dakota Seal
Site Search:
Bill Quickfind:  


Download Section in Microsoft Word FormatPrinter Friendly
Rule 74:29:11 IN SITU LEACH MINING

CHAPTER 74:29:11

 

IN SITU LEACH MINING

Section

74:29:11:01        Application for in situ leach mine permit -- Contents.

74:29:11:01.01   Underground injection control -- Class III Well permit required for mine permit.

74:29:11:02        Application content requirements -- Additional baseline information required.

74:29:11:03        Application content requirements -- Mine operations plan.

74:29:11:04        Application content requirements -- Reclamation plan.

74:29:11:05        Determination of ground water restoration demonstration.

74:29:11:06        Ground water restoration table.

74:29:11:07        Establishment of baseline water quality in new mining areas.

74:29:11:08        Technical revisions to an in situ leach mine permit.

74:29:11:09        Designation of exempted aquifers.

74:29:11:10        Injection wells subject to the provisions of this chapter.

74:29:11:11        Well location and protection.

74:29:11:12        Well construction requirements.

74:29:11:13        Well construction requirements -- Injection wells.

74:29:11:14        Minimum requirements for monitor wells.

74:29:11:15        Disposal of drill cuttings.

74:29:11:16        Mechanical integrity testing of injection wells.

74:29:11:17        Supervision of well construction and testing.

74:29:11:18        Requirements for plugging drill holes and repair, conversion, and plugging wells.

74:29:11:19        Corrective actions for improperly sealed wells.

74:29:11:20        Authorizing new injection wells within permit area boundary.

74:29:11:21        Design and construction of in situ leach mine surface facilities.

74:29:11:22        Construction quality assurance plan.

74:29:11:23        Pond and surface impoundment design and construction requirements.

74:29:11:24        Pipeline design and construction requirements.

74:29:11:25        Recovery plant and satellite facility design and construction requirements.

74:29:11:26        Uranium byproduct material handling and disposal systems.

74:29:11:27        Disposal of liquid waste.

74:29:11:28        Disposal of nonradioactive solid waste.

74:29:11:29        Prohibitions -- Injection volumes and pressure.

74:29:11:30        Production area operational monitoring requirements.

74:29:11:31        Production area monitor well location and spacing requirements.

74:29:11:32        Nonproduction zone monitoring.

74:29:11:33        Subsidence monitoring.

74:29:11:34        Confinement of recovery fluid.

74:29:11:35        Reporting excursions.

74:29:11:36        Verifying analysis.

74:29:11:37        Excursion sampling frequency.

74:29:11:38        Remedial action for excursion.

74:29:11:39        Excursions -- Controlled.

74:29:11:40        Excursions -- Not controlled.

74:29:11:41        Criteria for determination of adequacy of remedial action plan.

74:29:11:42        Reporting requirements.

74:29:11:43        Well construction records.

74:29:11:44        Well plugging records.

74:29:11:45        Maintenance and retention of records.

74:29:11:46        Ground water restoration requirements.

74:29:11:47        Restoration sampling procedure.

74:29:11:48        Restoration progress reports.

74:29:11:49        Final restoration -- Restoration values achieved.

74:29:11:50        Restoration values not achieved.

74:29:11:51        Closure of mine site following restoration.

74:29:11:52        Reclamation of in situ leach mine surface facilities.

74:29:11:53        Radiation survey of surface facilities at mine closure.

74:29:11:54        Radiation standards for closure of surface facilities.

74:29:11:55        Postclosure plan -- Estimated costs for postclosure care.

74:29:11:56        General postclosure inspection and maintenance activities.

74:29:11:57        Postclosure operation of monitoring systems.

74:29:11:58        Ground water contamination during the postclosure period.

74:29:11:59        End of the postclosure period.

74:29:11:60        Public notice for in situ leach mines.


Back to 74:29 | 74:29:11 RSS
^ Back to Top